UK-Southend-on-Sea: project-design services other than for construction work
2010/S 164-252082
CONTRACT NOTICE
Works
SECTION I: CONTRACTING AUTHORITY
Contact: Attn: Tel. E-mail: South Essex College
Luker Road, Essex
Finance
Anthony McGarel
SS1 1NDSouthend-on-Sea
UNITED KINGDOM
+44 1702220412
steve.smith@gvagrimley.co.uk
Internet address(es)
General address of the contracting authority www.southessex.ac.uk
Address of the buyer profile http://www.mytenders.org/search/Search_AuthProfile.aspx?ID=AA5421
Further information can be obtained at:Contact: Attn: Tel. E-mail: Internet: GVA Grimley Ltd
10 Stratton Street
Planning Development and Regeneration
Steve Smith
W1J 8JRLondon
UNITED KINGDOM
+44 2079112217
steve.smith@gvagrimley.co.uk
www.gvagrimley.co.uk
Specifications and additional documents (including documents for competitive dialogue and a dynamic purchasing system) can be obtained at:Contact: Attn: Tel. E-mail: Internet: GVA Grimley Ltd
10 Stratton Street
Planning Development and Regeneration
Steve Smith
W1J 8JRLondon
UNITED KINGDOM
+44 2079112217
steve.smith@gvagrimley.co.uk
www.gvagrimley.co.uk
Tenders or requests to participate must be sent to:Contact: Attn: Tel. E-mail: Internet: GVA Grimley Ltd
10 Stratton Street
Planning Development and Regeneration
Steve Smith
W1J 8JRLondon
UNITED KINGDOM
+44 2079112217
steve.smith@gvagrimley.co.uk
www.gvagrimley.co.uk
Body governed by public law
Education
SECTION II: OBJECT OF THE CONTRACT
Strategic accommodation change.
Works
Realisation, by whatever means of work, corresponding to the requirements specified by the contracting authorities
Main site or location of works Grays both the Woodview Campus of South Essex College and the area around Grays Town Centre.
NUTS code UK
A public contract
II.1.4)
Information on framework agreement
Working with the College to undertake due diligence on a new site in Grays Town Centre. The successful Private Sector Partner (PSP) would then work with the College to develop designs, obtain statutory consents and construct circa 15 000 m² (GIA) of new educational facilities. In addition the PSP will be required to buy the College's existing Woodview site which will be surplus to requirements following construction of new facilities. The PSP will work with the College to design andobtain statutory consents for residential development. The PSP may be required to provide loan and transitional finance to structure the deal.
79421200, 71322000, 45000000, 70122000, 66122000
Yes
No
Yes
Excluding VAT
Range between 40 000 000 and 50 000 000 GBP
Yes
description of these options: Extension may be necessary if projected timescales for the project are exceeded for reasons outside the control of the College or PSP.
provisional timetable for recourse to these options: in months: 18 (from the award of the contract)
Duration in months: 36 (from the award of the contract)
SECTION III: LEGAL, ECONOMIC, FINANCIAL AND TECHNICAL INFORMATION
III.1.1)
Deposits and guarantees required
Installment Payments.
III.1.3)
Legal form to be taken by the group of economic operators to whom the contract is to be awarded
Yes
a) Viability - sufficient overall funding being available to the College which in turn is dependent on costs, the value of the bids for the Woodview site and College borrowing approval to sufficient level;
b) Sufficient overall funding being available to the College which in turn is dependent on costs and receipt levels bid for the Woodview site;
c) Skills Funding Agency approval;
d) Town planning consent for both new educational facilities and Woodview Site.
Information and formalities necessary for evaluating if requirements are met: All applicants are required to sign and return Form 2 - Statement Relating to Good Standing - Criteria for rejection of service providers - in accordance with Article 45 of Directive 2004/18/EC and Regulation 23 of the Public Contracts Regulations 2006. This is included in the Memorandum of Information and is available to all potential bidders via the following link or web site address:
http://dataroom.gvagrimley.co.uk/SouthEssexCollegeOJEUDocuments
Information and formalities necessary for evaluating if requirements are met: (1) All candidates will be required to provide a reference from their bank;
(2) All candidates will be required to provide evidence of relevant professional risk indemnity insurance;
(3) All candidates will be required to provide a statement, covering the 3 previous financial years including the overall turnover of the candidate and the turnover in respect of the activities which are of a similar type to the subject matter of this notice;
(4) All candidates will be required to provide statements of accounts or extracts from those accounts relating to their business.
Minimum level(s) of standards possibly required The economic operator must have sufficient economic and financial capacity to secure the delivery of the proposed works i.e the total project cost should not be greater than circa one fifth of the economic operator's turnover over each of the last 3 years (or where the economic operator is a joint venture vehicle, the parties comprising the vehicle or at least one of the parties guaranteeing the performance of the vehicle must individually have a turnover of at least five times the total project cost). For the purposes of this minimum level, the total project cost for the delivery of the College facility should be assumed at GBP 41 000 000. This is a pass/fail criterion.
Information and formalities necessary for evaluating if requirements are met:
(1) A statement of the candidate's average annual number of staff and managerial staff over the previous 3 years;
(2) Details of the educational and professional qualifications of their managerial staff; and those of the person(s) who would be responsible for providing the services or carrying out the work or works under the contract;
(3) A check may be carried out by the contracting authority or by a competent official body of the State in which the candidate is established, to verify the technical capacity of the candidate; and if relevant, on the candidates study and research facilities and quality control measures;
(4) An indication of the proportion of the contract which the services provider intends possibly to subcontract;
(5) A list of works carried out over the past 5 years, detailing the value of the consideration received; when and where the work or works were carried out; and whether they were carried out according to the rules of the trade or profession and properly completed.
The full conditions for participation are laid out in the PQQ and the summary above is not exhaustive.
III.2.4)
Reserved contracts
III.3)
CONDITIONS SPECIFIC TO SERVICES CONTRACTS
III.3.1)
Execution of the service is reserved to a particular profession
III.3.2)
Legal entities should indicate the names and professional qualifications of the staff responsible for the execution of the service
SECTION IV: PROCEDURE
Competitive dialogue
Envisaged number of operators 5
Objective criteria for choosing the limited number of candidates: As outlined below and as outlined in the memorandum of information associated with this notice and available to all potential bidders via the following link or web site address: http://dataroom.gvagrimley.co.uk/SouthEssexCollegeOJEUDocuments.
Criteria.
— Financial & economic information, including economic and financial capacity / standing,
— Contractual matters,
— HR, environmental and quality issues,
— Relevant technical experience,
— Proven track record of delivering similar projects of the bidder and members of its consortium,
— Project delivery team – core team,
— Relevant partnership working experience,
— Understanding of the financial and property challenges facing Further Education Colleges,
— Financial information specific to the proposal in terms of credit availability, financial backers.
IV.1.3)
Reduction of the number of operators during the negotiation or dialogue
The most economically advantageous tender in terms of the criteria stated in the specifications, in the invitation to tender or to negotiate or in the descriptive document
No
IV.3.1)
File reference number attributed by the contracting authority
IV.3.2)
Previous publication(s) concerning the same contract
Payable documents
price 30 GBP
Terms and method of payment: No charge for digital copies of documents downloaded through the following link or web site address: http://dataroom.gvagrimley.co.uk/SouthEssexCollegeOJEUDocuments Payment of 30 GBP required by cheque with request if for hard copies.
4.10.2010 - 17:00
29.11.2010
English.
IV.3.7)
Minimum time frame during which the tenderer must maintain the tender
IV.3.8)
Conditions for opening tenders
SECTION VI: COMPLEMENTARY INFORMATION
VI.1)
THIS IS A RECURRENT PROCUREMENT
VI.2)
CONTRACT RELATED TO A PROJECT AND/OR PROGRAMME FINANCED BY EU FUNDS
(MT Ref:78461)
Tel. High Court
Strand
WC2A 2LLLondon
UNITED KINGDOM
+44 2079476000
Precise information on deadline(s) for lodging appeals: The College will observe a minimum of 10 calendar days standstill from the point at which its decision on award of the contract is communicated to unsuccessful tenderers. This period allows unsuccessful tenderers to seek further debriefing from the College before the contract is entered into. Applicants have 2 working days from the notification of the award decision to request additional information which must then be provided no later than 3 working days before the end of the stand still period. Any request for such additional information should be addressed to the contract idenitifed at section 1.1. Aggrieved parties who are not satisfied after provision of information in accordance with the preceding paragraph and who have been harmed or are at risk of harm by a breach of the Public Procurement Regulations 2006 (SI 2006 No 5) may take action in the High Court (England, Wales and Northern Ireland). Any such action must be brought promptly within 3 months of the alleged breach.
VI.4.3)
Service from which information about the lodging of appeals may be obtained
24.8.2010