UK-Bath: protective goggles
2010/S 162-249696
CONTRACT NOTICE
Supplies
SECTION I: CONTRACTING AUTHORITY
Attn: Tel. E-mail: Fax Defence Clothing (DC), DE&S
Spur 9 Block B Ensleigh
Gwyn Evans
BA5 5ABBath
UNITED KINGDOM
+44 1225472480
DESCommodities-Comrcl-Cluster4@mod.uk
+44 1225467429
Further information can be obtained at: As in above-mentioned contact point(s)
Specifications and additional documents (including documents for competitive dialogue and a dynamic purchasing system) can be obtained at: As in above-mentioned contact point(s)
Tenders or requests to participate must be sent to: As in above-mentioned contact point(s)
Ministry or any other national or federal authority, including their regional or local sub-divisions
Defence
The contracting authority is purchasing on behalf of other contracting authorities No
SECTION II: OBJECT OF THE CONTRACT
Combat protective eyewear.
Supplies
Purchase
Main place of delivery UNITED KINGDOM.
NUTS code UK
The establishment of a framework agreement
Framework agreement with a single operator
Duration of the framework agreement: Duration in year(s): 4
Estimated total value of purchases for the entire duration of the framework agreement
estimated cost excluding VAT
Range: between 7 000 000 and 8 300 000 GBP
Protective goggles. 1. Protective eyewear compliant to, but not limited to, BS EN 165, 166, 168, 170, 172, 207, BS 2782 Pt 5 Method 521A, MIL-PRF-31013, MIL-V-43511C (or equivalents). An inability to meet the ballistic requirements of the specifications will render the item(s) ineligible for the tender process. The solutions are to have interchangeable lenses, clear, amber and dark, and are to be capable of incorporating corrective prescription lenses;
2. The current solution provides 2 types of protective eyewear, one for each of the standards of ballistic tolerance, however a single item which meets the criteria may, subject to a user trial, be deemed suitable. Typical quantities, based on current usage, are 70 000 spectacles and 30 000 goggles per annum. Potential suppliers should note that there is no intention of creating 2 lots and that a single supplier must be capable of meeting all of the items’ requirements in accordance with the detailed specifications which will be released at the ITT stage;
3. Due to the environments in which the items will be used desirable features will include a high resistance to scratching and an ability to provide component parts for user effected repair;
4. A short duration (max 3 weeks) user trial will be used at ITT stage;
5. The Authority is seeking expressions of interest from suitably experienced and qualified companies who wish to be included on a list of potential tenderers for the MOD’s protective eyewear enabling contract. The contract will be for 2 years with, in addition, 2 single year extension options;
6. A PQQ will be issued to all potential suppliers who register an expression of interest;
7. Downselection will be based on PQQs returned with a maximum of 6 companies being taken forward to the tender stage. PQQ Pt 1 will not be scored; PQQ Pt 2 will contain the criteria against which the companies will be scored;
8. The announcement of the possible future purchase shall not be construed as a commitment by the MOD to place an order upon completion of the tendering process. Any expenditure, work or effort undertaken prior to contract award is solely for the commercial judgement of potential suppliers.
33735100
No
No
Yes
Requirement based on current solution equates to approximately 70 000 spectacles and 50 000 goggles per annum. A single item solution may reduce these estimates.
Excluding VAT
Range between 7 000 000 and 8 300 000 GBP
Yes
description of these options: The intended framework agreement will have an initial 2 year duration with 2 additional single year extensions dependent upon the progress of PECOC, which is the MOD's encompassing protective clothing system, that will novate this requirement.
provisional timetable for recourse to these options: in months: 24 (from the award of the contract)
Number of possible renewals 2
in the case of renewable supplies or service contracts, estimated timeframe for subsequent contracts: in months: 12 (from the award of the contract)
Duration in months: 48 (from the award of the contract)
SECTION III: LEGAL, ECONOMIC, FINANCIAL AND TECHNICAL INFORMATION
Parent Company or Banker's Guarantee may be required.
BACS (payment within 30 days of order receipt), P2P.
Manufacturer, Supplier, Consortium.
No
Information and formalities necessary for evaluating if requirements are met: Economic Operators who submit an expression of interest (EOI) will be required to complete a pre qualification questionnaire (PQQ) that will address sections III.2.1 - III.2.3.
III.2.2)
Economic and financial capacity
III.2.3)
Technical capacity
No
III.3)
CONDITIONS SPECIFIC TO SERVICES CONTRACTS
III.3.1)
Execution of the service is reserved to a particular profession
III.3.2)
Legal entities should indicate the names and professional qualifications of the staff responsible for the execution of the service
SECTION IV: PROCEDURE
Accelerated restricted
Justification for the choice of accelerated procedure: Rapid execution of major public investment projects.
Envisaged minimum number 5 maximum number 6
Objective criteria for choosing the limited number of candidates: 1. Financial viability of prospective contractor (Pass/Fail);
2. Relevant ISO 9001:2008 accreditation (or equivalent) covering, as appropriate, Designer, Manufacturer and Supplier (Pass/Fail);
3. Satisfactory completion of ‘Certificate of Good Standing’ (Pass/Fail);
4. Ability to Trade electronically (Pass/Fail) [In accordance with www.d2btrade.com/help/index.cfm];
5. Quality in high volume production [weighting 25 %];
6. Sustainable Procurement (ISO 14001 or equivalent) [weighting 5 %] and Corporate Social Responsibility (SA 8000 or ILO certification/adherence) [weighting 10 %];
7. Supply Chain Management to ensure supply and delivery. [weighting 25 %];
8. Risk Management – demonstrating an ability to identify, manage, and reduce/eliminate risk throughout the supply chain [weighting 20 %];
9. Experience of successful delivery of similar requirements [weighting 15 %].
Non Pass/Fail items will be marked: excellent confidence – 100 %; good confidence – 70 %; concerns – 40 %; major concern 0 %.
An overall pass mark of 70 % will be required for the non Pass/Fail items and should more than 6 companies achieve this mark only the top six will be taken forward to the ITT stage.
IV.1.3)
Reduction of the number of operators during the negotiation or dialogue
The most economically advantageous tender in terms of the criteria stated in the specifications, in the invitation to tender or to negotiate or in the descriptive document
Yes
Yes. A reverse auction, conducted using electronic means, may be used as part of the procurement process for this requirement. Specific relevant information on Reverse Auction usage will be given in the invitation to tender.
DC4/4055
No
IV.3.3)
Conditions for obtaining specifications and additional documents
30.8.2010 - 12:00
IV.3.5)
Date of dispatch of invitations to tender or to participate to selected candidates
English.
IV.3.7)
Minimum time frame during which the tenderer must maintain the tender
IV.3.8)
Conditions for opening tenders
SECTION VI: COMPLEMENTARY INFORMATION
No
No
Suppliers interested in working with the Ministry of Defence should register on the MOD Supplier Information Database (SID) Register, available at www.contracts.mod.uk. The MOD SID is a database of active and potential suppliers available to all MOD and UK Defence procurement personnel, and is the main supplier database of MOD Procurement organisations. Please note: the registration and publication of a company profile on the MOD SID does not mean or imply that the supplier has in any way been vetted or approved by the MOD. Suppliers wishing to compete for advertised MOD contracts must respond to any specific call for competition by submitting a separate expression of interest in accordance with the instructions of the purchasing organisation.
Advertising regime OJEU:- These contract opportunities are published in the Official Journal of the European Union (OJEU) and the MoD Defence Contracts Bulletin. The award of any subsequent contract arising from such requirements is subject to the Public Contract Regulations 2006. Where advertising is necessary in the OJEU and the DCB, the content of the two adverts must be exactly the same. Tracker reference: TKR-2010819-DCB-1835225 GO reference: GO-2010819-DCB-1835226.
E-mail: Tel. Fax Defence Clothing (DC), DE&S
Spur 9 Beckford
BA1 5ABEnsleigh
UNITED KINGDOM
DESCommodities-Comrcl-Cluster4@mod.uk
+44 1225472480
+44 1225467429
Body responsible for mediation procedures
Defence Clothing (DC), DE&S
Precise information on deadline(s) for lodging appeals: The Authority will incorporate a minimum 10 calendar day standstill period at the point when information on the award of contract is communicated to tenderers. This perios allows unsuccessful tenderers the opportunity to seek clarification and/or further debriefing from the contracting authority before the contract is entered into. Such debriefs should be requested of the officer named in this contract notice or in the letter/e-mail providing information about contract award.
Defence Clothing (DC), DE&S
19.8.2010