UK-Warwick: industrial machinery
2010/S 161-248869
PERIODIC INDICATIVE NOTICE - UTILITIES
Supplies
This notice is a call for competition Yes
This notice aims at reducing time-limits for receipt of tenders No
SECTION I: CONTRACTING ENTITY
Attn: Tel. E-mail: National Grid
Warwick Technology Park, Gallows Hill
Stuart Alford
CV34 6DAWarwick
UNITED KINGDOM
+44 1926656013
stuart.alford@uk.ngrid.com
Internet address(es)
General address of the contracting entity www.nationalgrid.com
Further information can be obtained at: As in above-mentioned contact point(s)
Specifications and additional documents (including for a dynamic purchasing system) can be obtained at: As in above-mentioned contact point(s)
Tenders, requests to participate or expressions of interest must be sent to: As in above-mentioned contact point(s)
Production, transport and distribution of gas and heat
Electricity
SECTION II: OBJECT OF THE CONTRACT
Mobile Degasser and Dryer Refit Project.
Supplies
This specification is the refit of National Grid Mobile Degasser & Dryer.
This document stipulates the key requirements which National Grid will expect the successful supplier to provide if proposing to bid for the above.
1. General requirements.
National Grid are looking to upgrade two existing processing units (MDD 3 and MDD4) to provide drying/degassing at a minimum of 7 500 litres per hour combined with oil reclamation through media filled columns.
A statement confirming that the oil reclamation process supplied will remove potentially corrosive sulphur within five complete passes is required.
The replacement processing unit skid must be fitted in existing trailers that contain a 275KVA and 100 KVA generators, with due regard to existing axle weight limitations and trailer size (site visit can be arranged to view units).
Columns to have a maximum diameter of 14 inches and be heated by induction coils, not by direct heat, the burning / cooling air must be via vacuum not blown.
Columns to work in two independent banks i.e. one bank processing whilst other bank regenerating, with a maximum change over time of 14hrs and a maximum column recharge temperature of 100 degrees centigrade.
Buffer tank to be made in stainless steel with level gauges on both sides and inspection / cleaning hatches on both sides.
The availability of space and axle weight will limit the number columns however all available space / weight to be used to maximise the number of columns.
A vacuum capability down to 0.1 Torr with a flow rate greater than 2 500 m³/h.via a inches pipe connection with appropriate controls to be fitted.
Online moisture meter fitted to incoming oil flow and transformer level to be monitored via transducer / P.L.C.
All the processing equipment must be controlled via a P.L.C. controller using standard software via a laptop or touch screen.
A 3G broadband satellite dish to be fitted to the roof of trailer to give full remote operation of all capabilities via a laptop, and the uploading of software patches / faulting finding via the broadband connection.
Prices to include removal of existing skid, installation of new skid, fitting of 3G dish, supply of laptop for remote operation, any trailer modifications required, testing, commissioning, plus two days operative training on a National Grid site.
Have minimum maintenance requirements. (ideally only a visual check of condition and function will be required).
It should be noted that any of the above requirements may be varied during the lifetime of the contract in accordance with the contract terms and conditions.
As an option and priced separately - Remove existing generators, wiring and controls. Replace with one generator capable of running full load output of the processing unit. The preferred engine option is Cummins. The generators removed will remain the property of National Grid.
Applicable industry standards.
Please provide the appropriate certification to demonstrate compliance to all relevant industry standards.
Maintenance.
The supplier will be expected to provide a maintenance service to include the following:
— full availability of all required spares,
— service contact centre,
— full training for our user and maintenance engineers,
— all required service tools.
4. Product specifications.
The supplier shall maintain detailed documented specifications for each item used within the unit and to provide along with copies of the full specification when requested.
The supplier will be expected to identify any required changes to specifications driven by legislative and/or National Grid requirements, and have a clear process in place for doing this that is embedded within its Quality Management System.
5. Product disposal service.
The supplier shall, if required, provide a service through which National Grid can dispose of products that have exceeded their useful life in an environment.
42000000, 09000000, 24000000, 31000000, 51100000
Duration in months: 12 (from the award of the contract)
II.6.1)
Initial estimated cost
II.6.2)
Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them
No
II.8)
ADDITIONAL INFORMATION
SECTION IV: PROCEDURE AND ADMINISTRATIVE INFORMATION
WS10646416
SECTION VI: COMPLEMENTARY INFORMATION
No
VI.2)
ADDITIONAL INFORMATION
VI.3)
ESTIMATED TOTAL VALUE OF SUPPLIES OR SERVICES CONTRACT(S)
18.8.2010
APPENDIX
PERIODIC INDICATIVE NOTICE BEING A CALL FOR COMPETITION OR AIMING AT REDUCING TIME-LIMITS FOR THE RECEIPT OF TENDERS
SECTION II: OBJECT OF THE CONTRACT
Mobile Degasser and Dryer Refit Project.
Supplies
A public contract
II.1.4)
Information on framework agreement
This specification is the refit of National Grid Mobile Degasser and Dryer.
This document stipulates the key requirements which National Grid will expect the successful supplier to provide if proposing to bid for the above.
1. General requirements.
National Grid are looking to upgrade two existing processing units (MDD 3 and MDD4) to provide drying/degassing at a minimum of 7 500 litres per hour combined with oil reclamation through media filled columns.
A statement confirming that the oil reclamation process supplied will remove potentially corrosive sulphur within five complete passes is required.
The replacement processing unit skid must be fitted in existing trailers that contain a 275KVA and 100 KVA generators, with due regard to existing axle weight limitations and trailer size (site visit can be arranged to view units).
Columns to have a maximum diameter of 14 inches and be heated by induction coils, not by direct heat, the burning / cooling air must be via vacuum not blown.
Columns to work in two independent banks i.e. one bank processing whilst other bank regenerating, with a maximum change over time of 14 hrs and a maximum column recharge temperature of 100 degrees centigrade.
Buffer tank to be made in stainless steel with level gauges on both sides and inspection / cleaning hatches on both sides.
The availability of space and axle weight will limit the number columns however all available space / weight to be used to maximise the number of columns.
A vacuum capability down to 0.1 Torr with a flow rate greater than 2 500 m³/h.via a inches pipe connection with appropriate controls to be fitted.
Online moisture meter fitted to incoming oil flow and transformer level to be monitored via transducer / P.L.C.
All the processing equipment must be controlled via a P.L.C. controller using standard software via a laptop or touch screen.
A 3G broadband satellite dish to be fitted to the roof of trailer to give full remote operation of all capabilities via a laptop, and the uploading of software patches / faulting finding via the broadband connection.
Prices to include removal of existing skid, installation of new skid, fitting of 3G dish, supply of laptop for remote operation, any trailer modifications required, testing, commissioning, plus two days operative training on a National Grid site.
Have minimum maintenance requirements (ideally only a visual check of condition and function will be required).
It should be noted that any of the above requirements may be varied during the lifetime of the contract in accordance with the contract terms and conditions.
As an option and priced separately - remove existing generators, wiring and controls. Replace with one generator capable of running full load output of the processing unit. The preferred engine option is Cummins. The generators removed will remain the property of National Grid.
Applicable industry standards.
Please provide the appropriate certification to demonstrate compliance to all relevant industry standards.
Maintenance.
The supplier will be expected to provide a maintenance service to include the following:
— full availability of all required spares,
— service contact centre,
— full training for our user and maintenance engineers,
— all required service tools.
4. Product specifications.
The supplier shall maintain detailed documented specifications for each item used within the unit and to provide along with copies of the full specification when requested.
The supplier will be expected to identify any required changes to specifications driven by legislative and/or National Grid requirements, and have a clear process in place for doing this that is embedded within its Quality Management System.
5. Product disposal service.
The supplier shall, if required, provide a service through which National Grid can dispose of products that have exceeded their useful life in an environment.
No
SECTION III: LEGAL, ECONOMIC, FINANCIAL AND TECHNICAL INFORMATION
This will be detailed in the contract documents.
Any grouping of economic operators, including requirements relating to enrolment on proffessional or trade registers.
No
III.2.1)
Personal situation of economic operators, including requirements relating to enrolment on professional or trade registers
III.2.2)
Economic and financial capacity
III.2.3)
Technical capacity
No
III.3)
CONDITIONS SPECIFIC TO SERVICES CONTRACTS
III.3.1)
Execution of the service is reserved to a particular profession
III.3.2)
Legal entities should indicate the names and professional qualifications of the staff responsible for the execution of the service
SECTION IV: PROCEDURE
Negotiated
The most economically advantageous tender in terms ofthe criteria stated in the specifications, in the invitation to confirm interest or in the invitation to tender or to negotiate
No
Time limit for receipt of requests for documents or for accessing documents 3.9.2010 - 12:00
Payable documents no
3.9.2010
IV.3.3)
Time-limit for receipt of applications for an invitation to tender or to negotiate
English.
SECTION VI: COMPLEMENTARY INFORMATION
No
VI.2)
ADDITIONAL INFORMATION
VI.3.1)
Body responsible for appeal procedures
Precise information on deadline(s)
for lodging appeals:
VI.3.3)
Service from which information about the lodging of appeals may be obtained